From a single hotel suite to a 12,000 sq ft lobby, GraniteTop handles the volume, the coordination, and the schedule — so your project stays on budget.

Lobby reception counters, elevator lobby cladding, and 200+ guest bath vanities in Calacatta Gold marble.

Restaurant bar top in leathered quartzite, spa wet-room surfaces, and full guest room vanity program across 8 floors.

Multi-unit bath vanities for 153 rooms, lobby reception desk, and rooftop bar countertops.

Kitchen and bath surfaces across 180 units — coordinated with GC phasing to meet a tight TCO schedule.

Waterfall kitchen islands, full-height slab backsplashes, and master bath vanities across 12 penthouse floors.

Feature bar top in book-matched Nero Marquina, VIP lounge surfaces, and private dining room counters.
Reception desks, kitchen suites, bar tops, and conference room surfaces. Consistent material across every unit or floor.
Slab surrounds and hearths for lobbies, amenity spaces, and executive suites — cut to spec, installed to schedule.
Full-height stone cladding for elevator lobbies, restrooms, and feature walls. Book-matched panels available.
High-traffic stone flooring for entrances, corridors, and public spaces — templated and installed with minimal disruption.
Deep cleaning, repolishing, and crack repair for existing stone in occupied buildings. Night and weekend crews available.
We own the yard, the saws, and the crew — your single point of contact if something needs to be redone.
We sequence deliveries and installs around your construction schedule — occupied buildings, phased renovations, or fast-track projects.
Direct-to-fabricator pricing with no markups from middlemen. Consistent quotes across all units in a multi-family project.
Send us a set of drawings or a scope summary — we'll respond within one business day with a preliminary budget.
Get in touch